SMT Placement Machine Safety Operating Procedures 1. Make sure there is no foreign matter inside the device before starting the device.2. The device warms up for 1 to 2 minutes after open machine. When using after the holidays, it needs to be preheated immediately after turning on the power, and the preheating time is about 10 minutes.3. When the p
Read More