PCBA Manufacturers Temperature and Humidity Sensitive Components Management_
Technical
PCB without fiducial mark, Is There Any Way to do SMT for It
What Are the Benefits of Reserving Break-up Tab for PCB Production
How Does SMT Affect PCB Production Time and Speed It Up
Classification of PCBs from three aspects
Common Problems and Solutions for Dry Film pasting during PCB Manufacturing process
Several Elements to Inspect after PCB Design
What is a halogen-free circuit board?
What Do Capacitive Coupling and Decoupling Mean?
What Are the Differences Between PCB Paste Mask and Solder Mask?
How PCBA Is Packaged and Shipped
How long can PCBA finished products be stored?
What Are the Differences and Relations Between PCB, PCBA, and SMT?
PCB Baking Specifications
PCB "Solder Mask Tenting" and "Solder Mask Opening"
Five reasons for PCB deformation and six solutions
Importance of first article inspection of PCBA board
Temperature zone standard for SMT reflow soldering
Small and medium volume PCB manufacturers in China
The main reason for PCBA cleaning
For power filter, the more capacitors, the better?
What does PCBA programming mean?
Content of PCB incoming testing
What conditions must be met for PCB circuit board soldering?
What is Blind via and Buried via
PCBA Manufacturers Temperature and Humidity Sensitive Components Management
Why choose Shenzhen SMT processing factory?
How long does it take to calculate the quotation for PCBA manufacturing?
Introduction of PCB design clearance requirements
Explanation of BOM, DIP, SMT, SMD
Introduction of the process of PCBA prototype
How to prevent pseudo soldering or cold soldering defects in PCBA manufacturing?
Factors that affect the Price of FPCB
What information is required for SMT processing at PCBA factory?
Skills of using 0ohm resistor in PCB design
How to select a PCBA manufacturer
SMT processing solder joint quality inspection
Characteristics difference between immersion gold PCB and gold plating PCB
Common malfunctions of Circuit Board Caused by Moisture
A Few Rules about PCB Panelization
Compare of multi-layer PCB with single/double layer PCB
Why do we need to introduce so many subdivided GND
Difference between immersion gold boards and gold plating boards
Aluminum PCB structure
Classification of different GND in circuit
Why PCB baking is necessary during manufacturing process
The handle and precautions of OSP board in SMT process
How is to choose capacitors for filter decoupling
How to choose filter capacitor for switching power supply
5 database need for SMT process
Function of three-terminal capacitor
Introduction of PCB OSP surface treatment
Method of inspecting the quality of SMT by step
How to find the short point between VCC and GND
Difference between 850nm and 940nm infrared LED
Component layout of PCB SMT DFM
Pad shape influence on the strength and reliability of the soldering joints
The difference between high temperature solder paste and low temperature solder paste
Introduction to manual welding processing
Manual visual inspection in PCBA processing
Characteristics of the conformal coating process
Difference between hardware engineers and software engineers
PCBA processing operation rules
China PCB upstream materials has continued to soar
Difference between serial buses and parallel buses
The key points of quality control in PCBA processing
Common causes of solder beading during SMT process
Analysis of the advantages and disadvantages of HASL PCB surface
Requirements for layout of components during SMT assembly
Selection of electronic components and CCL for PCBA
Performance and appearance quality inspection of components.
Quality and Reliability of SMT Chip Processing and Production
Coupling and decoupling function of capacitor
Two methods to connect digital ground and analog ground
Common sense in SMT process
Soldering solution to large heat absorption solder joints and easily oxidized pads
Reflow soldering stage in the BGA assembly process
Introduction of Capacitors
Practical method to use the AOI system at present
How to choose a LED placement machine
Explains and prospects of application LED in greenhouse plant
methods to improve the efficiency of FPC testing
The key points that affect the service life of soldering iron tip
PCBA product storage period
Design skills of RF PCB and microwave PCB
Replace IC skills to make PCB circuit design more perfect
PCB failure analysis
How to get an irregular shape PCB design

PCBA Manufacturers Temperature and Humidity Sensitive Components Management

In PCBA manufacturers, electronics components are one of the main processing materials. The management of temperature and humidity sensitive components is relatively important in the storage and processing, which will directly affect the quality of PCBA products.

1. Generally, PCBA manufacturers will develop a system for controlling temperature and humidity sensitive components. When in use, the workshop environment temperature should be controlled at 18°C-28°C. During storage, the temperature should be controlled at 18°C-28°C, and the relative humidity should be less than 10%. In order to maintain the temperature and humidity environment in the enclosed area of the factory, the space or door should not be open for more than 5 minutes.

2. To prevent static electricity from damaging the components, when unpacking the vacuum package of humidity-sensitive components, the operator must first wear electrostatic gloves and an electrostatic wristband, and then open the vacuum package on a table with good electrostatic protection. Check whether the changes of components temperature and humidity card meet the requirements, and only those that meet the requirements can be labeled.

3. If you receive the humidity-sensitive components in bulk, you should first check the label on the packaging bag to confirm whether it is qualified.

4. Check that a desiccant, relative humidity card, etc. must be attached to the moisture-proof bag.

5. After the humidity-sensitive components are removed from the vacuum packaging and before the reflow, the operation must be carried out in strict accordance with the corresponding standards of the PCBA manufacturers.

6. Store the unopened components as required. The opened components need to be baked and then put into a vacuum-sealed moisture-proof bag before they can be stored.

7. For unqualified components, hand over to the quality control personnel to return to the warehouse.