BGA rework process_
Technical
Multilayer PCB DFM Tips
BGA rework process
Save PCB manufacturing cost at design stage
Three ways of PCBA coating
Surface mount assembly growing fast
FPCB specification
V-CUT Design &DFM
Via types in PCB
PCBA preservation and shelf life
Ways to avoid solder beading during SMT process
5 ways to choose a PCBA package manufacturer
The original data of SMT placement machine programming
3types of SMT stencil production process
Green or black Soldermask?
Four methods to do PCB outline
Common factors affect PCB price
FR1, FR2, FR3, FR4 material
Do you accept X-out board?
PCBA testing
Main material of Flex PCB
Mill PCB bare board by yourself
Turn an idea into a new product-PCB prototype
Copper weight VS Line/Space
Basic knowledge of Gerber format
Introduction of Aluminum copper clad
PCB laminate choose for M2M designs
Four features to consider in PCB layout
Difference between THT and SMT
AT & S investing in Chongqing PCB plant
High layer board manufacturing difficulties
Halogen-Free requirements
5 ways to choose a PCBA package manufacturer
IPC-9121-PCB manufacturing process troubleshooting
Through hole immersion soldering process
PCBA conformal coating process steps
Pseudo soldering inspection and control plan
Tips in Board edge design- routing &V-cut
Industrial robots advantages in the PCB industry
ENEPIG surface treatment
Grade of FR4 CCL
SMT Machine for LED beads
Choose a right PCB assembler
Factors affect CCL quality
PCB structure and development
PCB price calculation description
How to prevent bow and twist during reflow oven process?
Broader range of PCB applications
China PCB industry’s new challenge
LED industry promotion in Guangdong province
10 important features of high reliability circuit boards
Germany PCB plant Enzmann close its small batch PCB plant
PCB glossary T-Z
PCB glossary R-S
PCB glossary M-P
PCB glossary G-L
How is the cost of SMT price calculated
Detailed processing flow of PCBA manufacturing
PCB glossary D-F
PCB glossary A-C
Japanese PCB industry in 2015
Common mistakes in PCBA files
Catching DFM problems during PCB design
Configuration requirements of SMT line
Why is green color soldermask common?
Few PCB Design tips
Use HDI technology to produce smaller PCB
PCBA sample manufacturing procedures
The relationship and difference between EMS and PCBA
The meaning of layers in PCB
Is PCBA Manufacturing fee a standard for judge electronic manufacturing factories
How to DIY PCB and soldering
Long-time storage components may cause cold soldering during SMT
Vias treatment in PCB manufacturing
Counterbore and Countersink Hole in PCB
Four factors affect Rigid PCB price
Control of FPC SMT
Difference between ENIG and plating gold PCB
Factors that affect prototype PCB price
Why is SMT technology so popular
3 Methods of DIY PCB
Tips of components Placement on PCB design
Tips of PCB Layout
Peelable solder mask PCB manufacturing
PCBA aging test specifications of SYS Tech
defect of PCBA manufacturing
Tips of Schematic design
PCB Silkscreen layer introduction

BGA rework process

As BGA packages have become more widely-accepted the BGA rework process has become more difficult. This has meant that both the equipment used in BGA rework as well as the technicians doing the rework have had to become more sophisticated.
 
The increased use of BGAs and the underlying trend of ever-smaller package sizes, finer pitches and their placement on to ever denser printed circuit boards has led to greater and greater challenges in BGA rework.
 
In addition to the equipment requirements for modern day BGA rework, the skill level, dexterity and process knowledge of the rework technicians working on BGA rework is even more demanding today. The BGA rework technician needs to understand reflow profiles in order to deal with printed circuit boards with a high density of ground planes.
 
The BGA rework technician must also understand flux chemistries and how this impacts the kind of cleaning which can be done underneath the device. The BGA rework technician must also be able to understand how a variety of conformal coatings can be removed from the PCBA as well as underneath the BGA. BGA rework technicians must also understand how device which neighbor the BGA to be reworked can or could be impacted by the BGA rework process profile.
 
Placement accuracies for today’s BGA rework need to be in the less than a 1mil tolerance range. In addition with the lead free packages the rework system now require sophisticated temperature control with programmable multi zone bottom heaters, nitrogen capability and low flow rates at the air nozzle.
 
In addition to the rework equipment set the inspection equipment needs to be of a higher capability. X-ray inspection equipment with very small spot sizes is a requirement for BGA inspection post BGA rework. The ability to measure the sphericity of the solder balls, the solder ball diameter, the ability to shoot through RF shields as well as higher density ground planes is now a necessity for the x-ray equipment requirements for BGA rework. Also the endoscope is a necessity for checking the ball collapse, the surface of the BGA ball post reflow, the wetting action as well as other attributes is important in BGA rework.